Gorontalo Project

PT PLN Energi Gas has developed the Gorontalo LNG Regasification Facility to support the supply of natural gas for power generation in the Gorontalo region. The facility plays an important role in receiving, storing, and regasifying LNG before it is supplied to the power plant.

The project aims to ensure a reliable and efficient gas supply for power generation in Gorontalo, while supporting fuel cost optimization and promoting the utilization of natural gas as an energy source for electricity generation.

Installation Details

INSTALLATION NAME
Gorontalo FSRU

OWNER
PT PLN Energi Gas

USER
PT PLN Indonesia Power

LOCATION
Paguat, Pohuwato, Gorontalo

POWER PLANT SUPPLIED
PLTG Maleo – 4 × 25 MW