{"id":8466,"date":"2025-03-11T14:26:00","date_gmt":"2025-03-11T07:26:00","guid":{"rendered":"https:\/\/prod.plnenergigas.co.id\/pln-energi-gas-conducts-site-visit-to-gorontalo-fsru-to-ensure-reliability-of-energy-supply"},"modified":"2026-09-07T01:20:44","modified_gmt":"2026-09-06T18:20:44","slug":"pln-energi-gas-conducts-site-visit-to-gorontalo-fsru-to-ensure-reliability-of-energy-supply","status":"publish","type":"post","link":"https:\/\/prod.plnenergigas.co.id\/en\/pln-energi-gas-conducts-site-visit-to-gorontalo-fsru-to-ensure-reliability-of-energy-supply","title":{"rendered":"PLN Energi Gas Conducts Site Visit to Gorontalo FSRU to Ensure Reliability of Energy Supply"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><b>Gorontalo, 11 March 2025<\/b><span style=\"font-weight: 400;\"> \u2013 As part of the company\u2019s efforts to ensure the reliability of the energy supply in preparation for Eid al-Fitr, as well as the smooth operation of strategic projects, PT PLN Energi Gas (PLN EG) conducted a site visit to the Gorontalo Floating Storage Regasification Unit (FSRU). The event was attended by the Acting President Director of PLN EG, the Acting Director of Finance and Human Resources, the Corporate Secretary, company management, and relevant strategic partners.<\/span><\/p>\n\n<p class=\"wp-block-paragraph\"><span style=\"font-weight: 400;\">The purpose of this site visit was to monitor the project\u2019s progress and evaluate the operational readiness of the Gorontalo FSRU in supporting energy needs leading up to Eid al-Fitr. The visit began with a presentation on the project, followed by an on-site inspection of the FSRU\u2019s key facilities, including the LNG storage system, the regasification process, and gas distribution to power plants. This inspection was conducted to ensure that all infrastructure is operating optimally, safely, and in accordance with industry standards.<\/span><\/p>\n\n<p class=\"wp-block-paragraph\">PLN EG\u2019s Acting President Director, Mr. Edwin Bangun, stated that the Gorontalo FSRU is part of the company\u2019s strategy to enhance national energy security. \u201cWe are committed to continuing to innovate and collaborate to provide reliable, efficient, and sustainable energy solutions for the community.\u201d With this visit, PLN Energi Gas hopes that the Gorontalo FSRU project will continue to benefit the community and support regional economic growth.&#13;\n<\/p>\n\n<p class=\"wp-block-paragraph\"> <\/p>\n\n<p class=\"wp-block-paragraph\">Contact Person<\/p>\n\n<p class=\"wp-block-paragraph\">Corporate Secretary<\/p>\n\n<p class=\"wp-block-paragraph\">PT PLN Energi Gas<\/p>\n\n<p class=\"wp-block-paragraph\">021-29721019<\/p>\n\n<p class=\"wp-block-paragraph\">About PLN Energi Gas<\/p>\n\n<p class=\"wp-block-paragraph\">PT PLN Energi Gas (PLN EG) is a subsidiary of PLN EPI that operates in the midstream gas sector. The company\u2019s core competency is the distribution of gas (pipeline gas and LNG) onshore and offshore (FSRU and LNGC) to power plants with high reliability.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gorontalo, 11 March 2025 \u2013 As part of the company\u2019s efforts to ensure the reliability of the energy supply in preparation for Eid al-Fitr, as well as the smooth operation of strategic projects, PT PLN Energi Gas (PLN EG) conducted a site visit to the Gorontalo Floating Storage Regasification Unit (FSRU). The event was attended<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-8466","post","type-post","status-publish","format-standard","hentry","category-press-release"],"acf":[],"_links":{"self":[{"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts\/8466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/comments?post=8466"}],"version-history":[{"count":1,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts\/8466\/revisions"}],"predecessor-version":[{"id":8467,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts\/8466\/revisions\/8467"}],"wp:attachment":[{"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/media?parent=8466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/categories?post=8466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/tags?post=8466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}