{"id":8513,"date":"2025-12-12T14:52:00","date_gmt":"2025-12-12T07:52:00","guid":{"rendered":"https:\/\/prod.plnenergigas.co.id\/supporting-national-energy-security-pln-energi-gass-board-of-commissioners-and-board-of-directors-inspect-the-tarakan-lng-proje"},"modified":"2026-09-07T09:54:52","modified_gmt":"2026-09-07T02:54:52","slug":"supporting-national-energy-security-pln-energi-gass-board-of-commissioners-and-board-of-directors-inspect-the-tarakan-lng-proje","status":"publish","type":"post","link":"https:\/\/prod.plnenergigas.co.id\/en\/supporting-national-energy-security-pln-energi-gass-board-of-commissioners-and-board-of-directors-inspect-the-tarakan-lng-proje","title":{"rendered":"Supporting National Energy Security, PLN Energi Gas\u2019s Board of Commissioners and Board of Directors Inspect the Tarakan LNG Proje"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Tarakan, 12 December 2025<\/strong> \u2013 The Board of Commissioners and the Board of Directors of PT PLN Energi Gas conducted a site visit to the Tarakan LNG Storage and Regasification Facility Project, located at the project site, on Friday (12\/12). This activity is part of efforts to strengthen corporate governance and provide direct oversight of the implementation of the company\u2019s strategic projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The site visit was attended by members of the Board of Commissioners, consisting of the Chairman of the Board of Commissioners, Commissioners, and the Board of Commissioners\u2019 Committee. Also present were members of the PLN Energi Gas Board of Directors namely the President Director, Director of Operations, and Director of Finance and Human Resources along with relevant PLN Energi Gas management personnel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During the event, the Executive Board of PLN Energi Gas provided a comprehensive overview of the business processes for the Tarakan LNG Storage and Regasification Facility Project to the Board of Commissioners. The presentation covered the project\u2019s technical aspects, operational workflows, and the strategic role of the LNG facility in supporting the reliability of energy supply, particularly for power plants in the Tarakan region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Edwin Bangun, Acting President Director of PLN Energi Gas, stated that this site visit served as an important opportunity to ensure a shared understanding between the Board of Directors and the Board of Commissioners regarding the implementation of the company\u2019s strategic projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThrough this site visit, we are directly introducing the business processes of the Tarakan LNG Storage and Regasification Facility Project to the Board of Commissioners, while also ensuring the project proceeds in accordance with the plan, safety standards, and the principles of good corporate governance,\u201d said Edwin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Meanwhile, Acting Chairman of the Board of Commissioners of PLN Energi Gas, Bayu Satria Pratama, emphasized the importance of the Board of Commissioners\u2019 oversight and support for the company\u2019s strategic projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis site visit provided a comprehensive overview of the project\u2019s progress and readiness. The Board of Commissioners is committed to continuing its oversight role to ensure this project runs smoothly and delivers optimal benefits for the sustainability of energy supply,\u201d Bayu explained.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition to the presentation, the Board of Commissioners and the Board of Directors also conducted a direct inspection of the project facility area to ensure that all stages of the work are proceeding in accordance with the plan, occupational safety regulations, and the implementation of Good Corporate Governance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Through this site visit, PLN Energi Gas reaffirms its commitment to ensuring that every strategic company project is carried out optimally, transparently, and accountably, in order to support the reliability of the national energy supply.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Contact Person<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Corporate Secretary<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">PT PLN Energi Gas<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">021-29721019<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">About PLN Energi Gas<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">PT PLN Energi Gas (PLN EG) is a subsidiary of PLN EPI that operates in the midstream gas sector. The company\u2019s core competency is the distribution of gas (pipeline gas and LNG) onshore and offshore (FSRU and LNGC) to power plants with high reliability.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tarakan, 12 December 2025 \u2013 The Board of Commissioners and the Board of Directors of PT PLN Energi Gas conducted a site visit to the Tarakan LNG Storage and Regasification Facility Project, located at the project site, on Friday (12\/12). This activity is part of efforts to strengthen corporate governance and provide direct oversight of<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[77],"tags":[],"class_list":["post-8513","post","type-post","status-publish","format-standard","hentry","category-press-release"],"acf":[],"_links":{"self":[{"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts\/8513","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/comments?post=8513"}],"version-history":[{"count":2,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts\/8513\/revisions"}],"predecessor-version":[{"id":8515,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/posts\/8513\/revisions\/8515"}],"wp:attachment":[{"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/media?parent=8513"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/categories?post=8513"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prod.plnenergigas.co.id\/en\/wp-json\/wp\/v2\/tags?post=8513"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}